CLIQ™ Launches Modular Lighting System Designed for Faster, Lower-Cost Data Center Construction

Innovative CLIQ system removes lighting as a construction bottleneck by dramatically reducing labor time and operating energy in large-scale facilities

DENVER, CO, UNITED STATES, January 15, 2026 /EINPresswire.com/ — CLIQ™, a new modular lighting system developed by SHIFT Innovations, the innovation engine of 1LUX, today announced the launch of a radically simplified lighting solution designed to address one of the most persistent and overlooked challenges in modern construction: slow, labor-intensive lighting installation that hasn’t evolved in decades.

As data centers and other large-scale facilities race to come online amid skilled labor shortages, rising construction costs, and aggressive delivery schedules, CLIQ replaces traditional lighting methods with a system engineered for speed, efficiency, and self-performed installation—reducing reliance on scarce skilled labor and complex wiring.

“Material and labor costs may vary, but time pressure is constant,” said Brian Stern, CEO at 1LUX. “CLIQ was built around that reality. We designed this system to remove lighting as a bottleneck so projects can move faster, crews can work more efficiently, and facilities can operate with lower ongoing energy costs once they go online.”

Traditional lighting systems can require thousands of labor hours per data center, often involving multiple installation phases and expensive skilled labor. CLIQ’s modular, Class 2 low-voltage design installs up to ten times faster than legacy systems and transitions seamlessly from temporary to permanent lighting—eliminating redundant work and significantly compressing construction timelines.

Beyond installation speed, CLIQ reduces long-term energy consumption, helping continuously operating facilities like data centers better control operating costs. The system also simplifies logistics and reduces packaging and job-site waste, improving safety, cleanliness, and overall site efficiency.

CLIQ was developed by lighting and construction veterans with decades of hands-on experience designing, selling, and installing systems across large-scale projects. That real-world perspective shaped a product focused less on adding features—and more on eliminating construction issues in large spaces like data centers.

“The latest construction methods demand the latest, most innovative construction solutions. CLIQ Modular Lighting helps contractors and developers build smarter where speed, labor availability, and energy efficiency define success,” Stern added. “CLIQ isn’t about reinventing lighting for the sake of it. It’s about building smarter for an era where speed, labor availability, and energy efficiency define success.”

While CLIQ was designed to address the acute challenges facing data center construction, the system is also well suited for other large-scale environments including warehouses, manufacturing facilities, public storage, and large-format commercial spaces.

For more information about CLIQ, visit CLIQLighting.com.


About 1LUX

1LUX is a Denver-based lighting company delivering unexpected ingenuity across a wide range of lighting products, logistics, and project solutions. With deep roots in design, distribution, and execution, 1LUX brings together innovative products, operational efficiency, and real-world expertise to solve complex challenges across large-scale commercial, industrial, and infrastructure environments. Through its portfolio of brands and services, 1LUX focuses on simplifying systems, reducing friction, and creating measurable value for clients at every stage of a project.

About SHIFT Innovations

SHIFT Innovations is the problem-solving and product incubation division of 1LUX. Driven by design thinking and hands-on industry experience, SHIFT identifies inefficiencies that have become accepted as “the way things are” and develops new solutions that rethink how lighting and construction systems should work. SHIFT is the creative engine behind CLIQ™ Modular Lighting System and future innovations across the 1LUX portfolio.

Kate Stuard
1LUX
kate@dsjstrat.com

Legal Disclaimer:

EIN Presswire provides this news content “as is” without warranty of any kind. We do not accept any responsibility or liability
for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this
article. If you have any complaints or copyright issues related to this article, kindly contact the author above.

Information contained on this page is provided by an independent third-party content provider. XPRMedia and this Site make no warranties or representations in connection therewith. If you are affiliated with this page and would like it removed please contact pressreleases@xpr.media

Houzeo Introduces an Advanced Cost of Living Calculator for Texas Homebuyers

Houzeo Introduces an Advanced Cost of Living Calculator for Texas Homebuyers

The new tool helps homebuyers compare affordability, everyday expenses, and housing choices across Texas. DALLAS, TX,

January 24, 2026

Talking to the Moon: World’s First Multimodal Foundation Model for Lunar Exploration and Resources

Talking to the Moon: World’s First Multimodal Foundation Model for Lunar Exploration and Resources

The same AI methods that power ChatGPT can now allow you to talk to the Moon Its good to be skeptical when applying

January 24, 2026

The Union Bank Company donates to Ohio nonprofits

The Union Bank Company donates to Ohio nonprofits

Bank’s fourth quarter giving strengthens communities through housing, hunger relief, and education The Union Bank

January 24, 2026

Kings Bay Campground Opens 2026 Reservations With Tri-State Border Tourism Focus

Kings Bay Campground Opens 2026 Reservations With Tri-State Border Tourism Focus

Champlain Destination Highlights Strategic Access to New York, Vermont, and Canada Attractions CHAMPLAIN, NY, UNITED

January 24, 2026

Dentistry Expert Molly Gunsaulis of Spokane, WA, Explains Early Signs of Feeding Problems for HelloNation

Dentistry Expert Molly Gunsaulis of Spokane, WA, Explains Early Signs of Feeding Problems for HelloNation

Why do some children struggle with eating, even when no obvious illness is present? SPOKANE, WA, UNITED STATES, January

January 24, 2026

Kepner-Tregoe, Inc. Appoints Andrew C. Marshall (Drew) as Chief Executive Officer; Andy Cook Named Executive Chair

Kepner-Tregoe, Inc. Appoints Andrew C. Marshall (Drew) as Chief Executive Officer; Andy Cook Named Executive Chair

PRINCETON, NJ, UNITED STATES, January 15, 2026 /EINPresswire.com/ — Kepner-Tregoe, Inc. (KT), a global training and

January 24, 2026

Overit Acquires Web Traffic Advisors to Lead In the AI Marketing Era

Overit Acquires Web Traffic Advisors to Lead In the AI Marketing Era

Overit acquires Web Traffic Advisors to expand AI-driven marketing, enhance search strategy, and position clients for

January 24, 2026

Lunar Helium-3 Mining Announces Live Discussion on Fusion Fuel Choices: Tritium vs. Helium-3

Lunar Helium-3 Mining Announces Live Discussion on Fusion Fuel Choices: Tritium vs. Helium-3

From the Moon to Earth: The Trillion-Dollar Helium-3 Frontier SCOTTSDALE, AZ, UNITED STATES, January 15, 2026

January 24, 2026

Arab America Foundation Launches 20 Under 20 for 2026

Arab America Foundation Launches 20 Under 20 for 2026

20 Under 20 Honorees Represent Strength, Creativity, and Leadership of the Next Generation of Arab Americans Empowering

January 24, 2026

Celayix and isolved Partner to Deliver Unified Workforce Management for the Security Industry

Celayix and isolved Partner to Deliver Unified Workforce Management for the Security Industry

The partnership gives security operators a cleaner path to manage shifts, reduce admin work, and improve coverage. NEW

January 24, 2026

Level 3 Construction Completes $11 Million WoodSpring Suites Santee, Expanding Extended-Stay Offerings in San Diego

Level 3 Construction Completes $11 Million WoodSpring Suites Santee, Expanding Extended-Stay Offerings in San Diego

New 122-suite hotel underscores Level 3 Construction’s expertise in high-quality, ground-up hotel construction SANTEE,

January 24, 2026

Kate Kristine Starts 2026 With Momentum as She Releases stranger i can’t tell

Kate Kristine Starts 2026 With Momentum as She Releases stranger i can’t tell

The emotionally rich single highlights her evolving sound and new collaboration with Release Global. Kate has an

January 24, 2026

NewYorkDress Expands 2026 Designer Lineup With New Spring and Prom Collections

NewYorkDress Expands 2026 Designer Lineup With New Spring and Prom Collections

Fresh arrivals from top formalwear designers introduce standout silhouettes, elevated details, and event-ready looks

January 24, 2026

CLIQ™ Launches Modular Lighting System Designed for Faster, Lower-Cost Data Center Construction

CLIQ™ Launches Modular Lighting System Designed for Faster, Lower-Cost Data Center Construction

Innovative CLIQ system removes lighting as a construction bottleneck by dramatically reducing labor time and operating

January 24, 2026

Cheyenne Dental Assistant School Announces Winter Opening to Support Wyoming’s Growing Dental Workforce

Cheyenne Dental Assistant School Announces Winter Opening to Support Wyoming’s Growing Dental Workforce

Cheyenne Dental Assistant School will open this winter, offering hands-on dental assistant training through a

January 24, 2026

Dental Implant FAQs: Scottsdale Dentist Answers Frequently Asked Questions

Dental Implant FAQs: Scottsdale Dentist Answers Frequently Asked Questions

Dr. Brandon Ryff, the director of Scottsdale Smile Center, answers some common questions about dental implant therapy

January 24, 2026

Tech-Enabled Intergenerational Living at Vincentian

Tech-Enabled Intergenerational Living at Vincentian

K4Connect supports intergenerational connection, reduces isolation for residents and students, and helps Vincentian

January 24, 2026

Local Law Firm Sodoma Law Announces Stephen L. Chryst as Principal Attorney of Greenville, SC Office

Local Law Firm Sodoma Law Announces Stephen L. Chryst as Principal Attorney of Greenville, SC Office

GREENVILLE, SC, UNITED STATES, January 15, 2026 /EINPresswire.com/ — Sodoma Law announces the promotion of Stephen L.

January 24, 2026

Genesis Exotic Transport Educates Consumers on Legal Boat Transport and Risks of Non-Compliant Carriers

Genesis Exotic Transport Educates Consumers on Legal Boat Transport and Risks of Non-Compliant Carriers

Genesis Exotic Transport provides guidance on legal boat hauling standards to help owners avoid the legal and financial

January 24, 2026

UtilityRates.Com Warns Electricity Customers of Higher Bills On New Year’s Day

UtilityRates.Com Warns Electricity Customers of Higher Bills On New Year’s Day

22 states face utility rate hikes averaging 6.1% as winter heating demands peak and wholesale electricity costs climb

January 24, 2026

DFW Party Rental Brings Ultimate Foam Party Experiences to Frisco, TX

DFW Party Rental Brings Ultimate Foam Party Experiences to Frisco, TX

From Glowing Foam to Gender Reveal Parties, choose DFW Party Rental in North Dallas, TX FRISCO, TX, UNITED STATES,

January 24, 2026

Professional Golfer Gavin Cohen Partners With Wealth Planning by Bob Chitrathorn on Financial Literacy

Professional Golfer Gavin Cohen Partners With Wealth Planning by Bob Chitrathorn on Financial Literacy

On the Green and Beyond: Gavin Cohen and Bob Chitrathorn Unite Around Financial Education CORONA, CA, UNITED STATES,

January 24, 2026

Houzeo Empowers Georgia Homebuyers With Its User-Friendly Cost of Living Calculator

Houzeo Empowers Georgia Homebuyers With Its User-Friendly Cost of Living Calculator

With this new tool, Georgia homebuyers can easily evaluate affordability, lifestyle costs, and available housing

January 24, 2026

JobSquad Secures U.S. Department of Labor National Registration for Apprenticeship Program

JobSquad Secures U.S. Department of Labor National Registration for Apprenticeship Program

JobSquad earned U.S. DOL national registration, enabling nationwide, employer-led apprenticeships that deliver paid

January 24, 2026

Houzeo Rolls Out a New Cost of Living Calculator to Help Illinois Home Buyers Plan Smarter

Houzeo Rolls Out a New Cost of Living Calculator to Help Illinois Home Buyers Plan Smarter

Illinois homebuyers can now compare affordability, lifestyle costs, and housing options with this new tool. CHICAGO,

January 24, 2026

Visible light writes hidden fluorescent patterns for anti-counterfeiting.

Visible light writes hidden fluorescent patterns for anti-counterfeiting.

GA, UNITED STATES, January 15, 2026 /EINPresswire.com/ — A new type of polymer material that can be patterned using

January 24, 2026

hh2 Expands People Platform with Native HCM and Automated Payroll Built for Construction

hh2 Expands People Platform with Native HCM and Automated Payroll Built for Construction

hh2 launches a Construction HR Platform, the People Platform, with end-to-end tools for contractor recruiting, employee

January 24, 2026

Influential Women Spotlights Rajni V. Harsh, PhD: A Legacy of Excellence in Education at Walnut Hills High School

Influential Women Spotlights Rajni V. Harsh, PhD: A Legacy of Excellence in Education at Walnut Hills High School

CINCINNATI, OH, UNITED STATES, January 15, 2026 /EINPresswire.com/ — Respected High School Biology Teacher and

January 24, 2026

Bebuzee ($BBUZ) Poised to Become the Next Global Super App, Targeting Hundreds of Millions of Users and a Trillion-Dollar Digital Economy

Bebuzee ($BBUZ) Poised to Become the Next Global Super App, Targeting Hundreds of Millions of Users and a Trillion-Dollar Digital Economy

MIAMI, FLORIDA / ACCESS Newswire / January 15, 2026 / Bebuzee Inc. ($BBUZ), the all-in-one digital super-app, today

January 24, 2026

GoodData Accelerates in Q4 with Product Innovation and Business Growth

GoodData Accelerates in Q4 with Product Innovation and Business Growth

SAN FRANCISCO, CALIFORNIA / ACCESS Newswire / January 15, 2026 / GoodData, a leading AI-native decision intelligence

January 24, 2026

Sustainable Leadership Emerges as a Key Driver for Scaling Connectivity Infrastructure

Sustainable Leadership Emerges as a Key Driver for Scaling Connectivity Infrastructure

"In times of disruption, leadership becomes the true infrastructure behind scalable connectivity," says telecom

January 24, 2026

Veteran Ready Organization Training Sets Standard for Cultural Understanding with Military-Connected Communities

Veteran Ready Organization Training Sets Standard for Cultural Understanding with Military-Connected Communities

Veteran Ready Training equips organizations nationwide with cultural understanding and competence to better serve

January 24, 2026

Patterson Consulting Group Announces 19% Price Reduction to Support Small Businesses Amid Economic Pressures

Patterson Consulting Group Announces 19% Price Reduction to Support Small Businesses Amid Economic Pressures

Woman-owned HR consulting firm lowers rates to improve access to people-first HR support for small businesses. ST.

January 24, 2026

Roots and Wings Goes Hollywood for 10th Anniversary Gala

Roots and Wings Goes Hollywood for 10th Anniversary Gala

Celebrating a decade of literacy advocacy in Palm Beach County Over the last decade, we have expanded our reach,

January 24, 2026

Rider’s Advantage Unveils New Brand Identity

Rider’s Advantage Unveils New Brand Identity

PONTE VEDRA, FL, GA, UNITED STATES, January 15, 2026 /EINPresswire.com/ — APCO Holdings announces a refreshed brand

January 24, 2026

A Bold New Standard: King’s North at Myrtle Beach National Reopens After Transformational Renovation

A Bold New Standard: King’s North at Myrtle Beach National Reopens After Transformational Renovation

Fairway corridors were restored, greens and surrounds were reimagined, and strategic intent was sharpened throughout

January 24, 2026

A Night of Elegance and Edge: New York Fashion Week Season 3 Takes Over St. Bartholomew’s Church This February 14, 2026

A Night of Elegance and Edge: New York Fashion Week Season 3 Takes Over St. Bartholomew’s Church This February 14, 2026

By EC Entertainment + Media and MY Runway Project NEW YORK, NY, UNITED STATES, January 15, 2026 /EINPresswire.com/ —

January 24, 2026

Digital Accelerant Highlights Revenue Challenges in Traditional Trade Show Lead Capture

Digital Accelerant Highlights Revenue Challenges in Traditional Trade Show Lead Capture

Digital Accelerant reveals how exhibitors are replacing outdated lead capture tools with automated video-based

January 24, 2026

Vetter reaches key launch milestones for the V-OVS® next tamper-evident syringe closure system

Vetter reaches key launch milestones for the V-OVS® next tamper-evident syringe closure system

Several recent steps move the closure toward commercialization RAVENSBURG, GERMANY, January 15, 2026 /EINPresswire.com/

January 24, 2026

Tuned Declares 2026 the Year Hearing Health Becomes a Standard Employer Benefit

Tuned Declares 2026 the Year Hearing Health Becomes a Standard Employer Benefit

Tuned calls on employers to close a critical benefits gap by making hearing health a standard driver of safety,

January 24, 2026